Remaining assay results for the final 370 meters of hole APC150-D1 produced two additional high-grade intercepts in the Ramp Zone from 1,200 meters to 1,400 meters below surface, expanded the mineralized envelope to 315 meters of strike by 100 meters in width by 350 meters vertically and bottomed in mineralization at 1,450 meters below surface
Read more at newswire.ca
This section contains press releases and other materials from third parties (including paid content). The Globe and Mail has not reviewed this content. Please see disclaimer.
