VANCOUVER, BC, Oct. 22, 2024 /CNW/ - Power Metals Corp ("Power Metals" or the "Company") (TSX VENTURE: PWM) (FRANKFURT: OAA1) (OTCQB: PWRMF) is pleased to announce that initial test work on ore sorting has been successfully completed with Tomra (Sydney, Australia) and has produced a high-grade cesium oxide product in preparation for chemical production test work. Metallurgical holes utilized for the ore sorting were drilled earlier this year as part of the summer 2024 drill program at the Company's 100% owned Case Lake Project ("CLP") in northeastern Ontario. Phase I of metallurgical drilling at West Joe was conducted on 4 (four) drill holes to target intercept shallow styles of mineralization between 1.65% Cs2O through 18.55% Cs2O (cesium oxide) hosted in pollucite. Along with cesium these holes included known spodumene mineralization zones up to 3.08% Li₂O and exceptionally high-grade tantalum mineralization zones up to 3,236ppm at the CLP (Table 1).
Read more at newswire.ca
This section contains press releases and other materials from third parties (including paid content). The Globe and Mail has not reviewed this content. Please see disclaimer.
